Shower being removedEverything I normally write is about building your brand new awesome shower. However, to do that you must first remove the old, outdated, non-awesome shower. There are several ways to do this, I’m gonna show you the easiest.

A lot of people will go in and chip every tile off the wall (don’t laugh, they do it…), then remove the drywall (or what’s left of it) to get down to the studs in order to build the new stuff. You don’t need to do that. It’s time-consuming, messy and will give you a fairly crappy attitude about the project right from the get-go. (Did I just type ‘get-go’??? I need a beer…)

 

tile with bullnose removedMost existing tiled showers being torn out are ‘builder’s grade’ showers, that means 4×4 or 6×6 tiles with a bullnose tile, normally 2″ wide, along the edges. Chipping each tile off the wall will waste an entire day. So you’re going to remove entire portions of the wall at a time.

The first thing you want to do is chip off the bullnose, or little rounded pieces, along the edges (and top, if you’re not going to the ceiling) of the shower. If you notice in the photo to the right I’ve already done this. [continue reading…]